800.467.3752
admin@teamperka.com
1111 Alabama St. | St. Joseph, MO 64504

Stressfree Building Solutions

Strong. ★ Affordable. ★ Flexible. ★ Easy. ★ Resilient.

Menu

Skip to content
  • About
  • Frames
  • Contact Us
    • Contact Us
    • Find us on Social Media
      • Facebook
      • Instagram
      • YouTube
    • Find Miracle Truss® On Social Media
      • Facebook
      • Instagram
      • YouTube
      • Miracle Truss Website
  • Miracle Truss® Buildings
  • Veritas Systems Construction

End Post Spacing
Home / End Post Spacing

Here are all the Documents Currently Available to you.

Documents and Information

  • Advantages & Disadvantages
  • Assembly Guide – Model 4000/4600
  • Assembly Guide – Models 5|6|7|8|9|10000
  • Assembly Guide – I-Beam
  • Building Codes
  • Building Frames Comparison
  • Clear Span
  • Color Chart
  • Virtual Color Picker
  • Component Deflection
  • Crane Buildings
  • Customer Reference Guide
  • End Post Spacing
  • End Wall Options
  • Typical Drawings
  • Wood Span Charts

Menu Bar

  • Home Page
  • About Us
  • Contact Us
  • Miracle Truss Buildings
  • Veritas Systems Construction

Find Us On Social Media

Visit Us On FacebookVisit Us On InstagramVisit Us On Youtube

Our Local Based Affiliated Crew

Veritas Systems Construction

What Does CWB Certified Mean To You?

CWB Certification

Our shop, fitters and welders are certified by the Canadian Welding Bureau due to its strict standards. This certification ensures your building’s strength stays true through the welds, and is accepted in all of the United States and Canada as the more stringent of the certifications.

©2025 -- All Rights Reserved